Infrastructure that reaches further
Evaluate opportunities to serve local power and thermal demand alongside the anchor customer.
Integrated power & cooling
Developing resilient energy infrastructure that connects resource abundance with new industry and local opportunity.
Founded by Adam Francis · A Pelago Power initiative

01The opportunity
A large energy customer can help establish the infrastructure for a wider economy.
Aero explores that opportunity through a combination of vertical-axis wind, solar, geothermal resources, and electrical and thermal storage. Data centers and critical industry are potential anchor customers.
The development task is to align the resource, the customer, and the place: reliable services for industry, with local participation and productive growth built into the project case.
02System architecture
Generation, cooling, and resilience influence one another. The configuration develops around site evidence and customer requirements.
Geothermal electricity is an option where resource conditions support it; ambient ground exchange is evaluated separately.
The generation mix begins with local conditions and a customer's actual demand. Aero brings vertical-axis wind, solar, geothermal resource assessment, and storage into the same design process.
Ambient ground exchange serves heating and cooling through heat pumps. Useful hot water can serve thermal loads. Geothermal electricity requires a separate assessment of temperature, flow, conversion losses, and net output.
03Development status
Aero is in early development. Current priorities are site screening, diligence, integrated feasibility, and customer formation.
Establish the resource case and identify what still needs to be measured.
Intended outputA prioritized site case and a scoped resource-validation program.
04Local economic value
The long-term ambition is to help resource-rich places develop new economic activity. Local benefits need to be designed, negotiated, and measured as part of the project.
Evaluate opportunities to serve local power and thermal demand alongside the anchor customer.
Identify construction, operations, maintenance, and supplier roles with experienced local partners.
Explore how dependable energy, cooling, and shared infrastructure could support other productive uses.
05Participate in the development
Development participation connects a defined scope of work to the evidence it will produce and the decision it will support.
Communities, landowners, utilities, data-center developers, and industrial customers can help define the opportunity.
Useful starting points: location, load requirements, infrastructure access, and local development priorities.
Resource specialists, engineers, technology providers, and experienced operators can help test the integrated case.
Useful starting points: field evidence, operating experience, serviceability, and a specific capability to contribute.
Early participation can support resource validation, integrated feasibility, and customer formation.
The discussion begins with use of funds, work scope, project risks, and the next development or financing decision.
One initiative in a wider energy development story.
Explore the broader work