Work with the urban fabric.
Assess existing systems, building needs, and the practical work of connecting occupied properties.
District of Columbia · Thermal Energy Networks
Heating and cooling.
Connected by the block.
A shared approach to the energy beneath city life. Connecting buildings, recovering useful heat, and developing a pathway toward neighborhood thermal networks.

Founded by Adam Francis · A Pelago Power initiative
01The urban opportunity
Homes, offices, and community buildings have different energy needs. A neighborhood approach looks for the connections between them.
DC TENs explores shared thermal infrastructure, building heat pumps, ground exchange, and available recovered heat. The opportunity is both technical and civic: how to deliver dependable heating and cooling through a system that works for the people it serves.
Assess existing systems, building needs, and the practical work of connecting occupied properties.
Coordinate the loop, ground exchange, utility access, and long-term operation across a district.
Put affordability, reliable service, workforce participation, and clear responsibilities into the project design.
02How the network works
An ambient water loop links buildings to heat sources and sinks. Select an operating example to see how heat can move through the block.
How do building loads, loop temperatures, ground conditions, electrical demand, and operating controls fit together across the year? A viable network needs an integrated answer.
03Design around the service
For building owners and communities, the value of a thermal network depends on the complete service: installation, cost, comfort, maintenance, and performance over time.
Connecting to a shared loop requires assessment of the building's heat pumps, distribution system, controls, and electrical capacity. Existing equipment, tenant needs, access, and the timing of replacement shape the retrofit plan.
04The development pathway
DC TENs is an initiative in policy development, stakeholder engagement, and proposed pilot planning. The concepts below describe a path to evaluate, authorize, and deliver projects.
Develop a proposed regulated thermal-utility pathway with clear ownership, operating responsibilities, and oversight.
Address cost recovery, customer safeguards, cost controls, labor and safety, and public-interest review.
Use engineering, affordability, and delivery criteria to evaluate candidate building clusters and proposed scopes.
Define performance reporting and decision gates so a pilot can inform the next development step.
Proposed contexts for evaluation. Site selection and authorization remain part of the development process.
Evaluate the transition within occupied buildings, with resident experience and the total cost of service at the center of the case.
Evaluate shared infrastructure alongside new buildings, coordinating the network with development schedules and complementary loads.
Initiative development, policy advocacy, and early screening. Under the proposed utility-led model, financing, engineering, and operating responsibilities would sit with utilities through an approved framework.
05Build the next step together
Progress depends on building owners, residents, utilities, public agencies, engineers, workforce partners, and development capital working around a defined project.
Bring building information, heating and cooling challenges, equipment-replacement plans, and resident priorities.
Contribute engineering, subsurface knowledge, utility coordination, service design, and operating experience.
Explore support for screening, feasibility, customer engagement, and accountable pilot-development milestones.
Different places. A connected purpose.
Explore the broader work